Results 1 to 10 of 346

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Senior Member Mark-II's Avatar
    Join Date
    Mar 2014
    Location
    Winnipeg
    Posts
    6,014
    Please tell me you just added the Talo gun, because I swear I looked and never saw it.

    I've already ordered one 51660 from the other guy (yesterday). It's a bit less there, but if I can I'm going to cancel it since I'd rather go through you guys.

    I'd rather have the 50676 besides.

    I'll get back to you on the mosin
    Schrödinger's Gat - The logical paradox which posits that a firearm, stored safe in the home, is at the same time On The Streets

  2. #2
    www.aztecharmory.ca
    Join Date
    Dec 2014
    Location
    Penticton BC
    Posts
    330
    Quote Originally Posted by Mark-II View Post
    Please tell me you just added the Talo gun, because I swear I looked and never saw it.

    I've already ordered one 51660 from the other guy (yesterday). It's a bit less there, but if I can I'm going to cancel it since I'd rather go through you guys.

    I'd rather have the 50676 besides.

    I'll get back to you on the mosin
    Yes the 50676 was just added... you're not losing it..
    It's Not Always a Matter of Need...

  3. #3
    www.aztecharmory.ca
    Join Date
    Dec 2014
    Location
    Penticton BC
    Posts
    330
    Next scheduled import date is Sept 5th. Order cut off is Aug 2nd.
    Thanks again for all your support.
    It's Not Always a Matter of Need...

  4. #4
    www.aztecharmory.ca
    Join Date
    Dec 2014
    Location
    Penticton BC
    Posts
    330
    September Permit Delay
    Normally, by now we would have our export permits in hand for the September shipment and be getting packed up for the shipment this weekend.

    However... at this point we are still waiting for Foreign Affairs to issue our IIC so that we can then apply to the DDTC and BIS for the export permits. Typically an IIC take 3-5 days... we are now on day 19! Our calls to them are answered with "there is no problem, we're working on it"
    Maybe it's not a problem for them, but for us, it is definitely a problem.

    So, at this point the Sept 5th import date is not going to be possible. Without the IIC in hand we cannot start the export permit application, so we are not able to predict the date... we can say that it will not be any earlier than the 19th because even if we get the IIC today, the US guys typically take 2-3 weeks to approve the permit applications... we can only hope that the DDTC and BIS are expedient this time and we are not pushed back too far.

    I will update here as soon as we get the IIC.
    Thank you all for you patience.
    It's Not Always a Matter of Need...

  5. #5
    www.aztecharmory.ca
    Join Date
    Dec 2014
    Location
    Penticton BC
    Posts
    330
    March permit application process underway... Thanks again to everyone for getting your orders in.

    Next planned import will be May 20th. Order cutoff date for that shipment is April 17th
    It's Not Always a Matter of Need...

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •